Speakeasy had to have the internal blocks replaced. While doing that, I installed a block to feed the line to the cockpit. Since that was going so well, I added a second reef line, which used up the internal boom blocks so I moved the outhaul exterior to the boom. That's how one thing leads to another. Mark/#612